Heres a few Pictures of work carried out recently
bedroom wall cut out and studwork built & plastered to provide onsuite to master bedroom
New Drainage channel & front step for local B&B.
The Finished Product
Fire Place removed, Bricked up (with vent for flue to breath) and Plasterwork made good.
New hardwood door step
wall & floor tiles
Cracked drain dug out and replaced
New soil stack, incorporating waste pipes from Bath, washbasin, bidet and onsuite basin & shower
speaks for its self
this chimney was so bad i had to take the pot & top 5 courses of bricks off (see below)
Back to normal again
plastic fascia,s soffit & gutters being fitted
The finished job complete with a coat of new paint
bathroom floor tiled
next door toilet floor tiled
Lead flashing to conservatory roof
The finished item
new connection into manhole
Leak through into bedroom, caused by felt rotting away
felt replaced & roof back on again
lack of "aim" had caused the floor to rot away under the w/c, so boards were replaced and new w/c fitted
conservatory "bridged" to enable painting works to be carried out
conservatory floor tiled
|